Customization: | Available |
---|---|
Color: | Grey |
Appearance: | Liquid |
Still deciding? Get samples of US$ 0.01/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Substrates | Dried and sanded existing finishes, all kinds of primer and putty. | |||
Surface Cleaning | Remove wax, silicon and other contaminations with degreaser | |||
Mixing Ratio | Temperature | Item | Weight | Volume |
below 25 degree | Fast Primer Surfacer | 100 parts | 3 parts | |
Fast Drying Hardener | 25 parts | 1 parts | ||
Thinner | 25-40 parts | 1-1.5 parts | ||
Pot Life | 25 degree, 45 minutes | |||
No. of Coats | 2-3coats, 40-60um in total. | |||
Flash-off Time | 5-10 minutes, 25 degree | |||
SSpray Gun & Pressure | Gravity Feed 1.4-1.6mm 3-5kg/cm 2 Siphon Feed 1.7-1.8mm 3-5kg/cm 2 |
|||
Drying Time | 25 degree, 2-3 hours | |||
Sanding | P400-P600 dry or P800-1000 wet. | |||
Re-coat | After drying and sanding, re-coat all kinds of topcoat. | |||
Shelf life | 2 years in original sealed can at cool and dry place at 20 degree | |||
Packaging | Primer Surfacer: 4L; Hardener: 1L |
Surstrates | Dried and sanded existing finishes and putty |
Surface Cleaning | Remove wax, grease or other contaminations with degreaser. |
Mixing Ratio | 1K Primer Surfacer: Thinner=1: 0.8-1.0 |
No. of Coats | 2-3 coats, total 30-50um |
Flash-off Time | 5-10 minutes at 25degree |
Spray Guns & Pressure | Gravity Feed 1.4-1.6mm 3-5kg/cm 2 Siphon Feed 1.7-1.8mm 3-5kg/cm 2 |
Dry Time | 30 minutes at 25degree |
Sanding | Dry sanding with P400-P600 or wet sanding with P800-P1000. |
Re-coat | After drying and sanding, re-coat with all kinds of topcoat |
Shelf Life | 2 years in original sealed can at cool and dry place at 20degree |
Packaging | 1L, 4L |
Substrates | Dried and sanded existing finishes, steel, iron and glass fiber reinforced plastic | |||||
Surface Cleaning | Remove wax, silicon and other contaminations with degreaser | |||||
Mixing Ratio |
Temperature | Item | Weight | Volume | ||
Above 30degree | Fast Epoxy Primer | 100 parts | 3.5 parts | |||
Drying Hardener | 20 parts | 1 parts | ||||
Thinner | 20-30 parts | 1 parts | ||||
Under 30 degree | Fast Epoxy Primer | 100 parts | 3.5 parts | |||
Fast Drying Hardener | 20 parts | 1 parts | ||||
Thinner | 20-30 parts | 1 parts | ||||
Pot Life | At 25degree, Fast Drying Hardener: 3-4 hours; Drying Hardener: 4-6 hours | |||||
No. of Coats | 2 coats, about 30-50 um | |||||
Flash-off Time | At 25degree, 5-10 minutes between coats. | |||||
Spray Gun and Pressure | Gravity Feed 1.4-1.6mm 3-5kg/cm 2 Siphon Feed 1.7-1.8mm 3-5kg/cm 2 |
|||||
Drying Time | Item | 25degree | 70degree | |||
Fast Drying Hardener | 3-5 hours | 40-50 minutes | ||||
Drying Hardener | 6-8 hours | 50-60 minutes | ||||
Sanding | Dry sanding with P240-P400, or wet sanding with P600-P800 | |||||
Re-coat | After drying and sanding, re-coat with putty, primer surfacer and all kinds of topcoat. | |||||
Shelf Life | 2 years in original sealed can at cool and dry place at 20degree | |||||
Packaging | Epoxy primer in 4L, Hardener in 1L, Thinner in 1L |